Tender process for 56 km Upeslejas-Misa railway section underway

Tender process for 56 km Upeslejas-Misa railway section underway

Published at: 2018-11-08 10:46 | Author: CIJ Baltics
Rail Baltica is calling for design submissions for a 56 km section that will connect Upeslejas to Misa with stops in Riga and the Latvian capital’s international airport. The railway project will include the route’s only tunnel as well as 12 road and 16 rail viaducts, 13 segregated pedestrian crossings and five bridges. The deadline for submissions is Jan. 22. The winner will have 24 months to create a detailed technical design, conduct engineering studies and create spatial design solutions. Rail Baltica has pre-selected six companies or groups of companies to take part in the tender process.

Similar Stories:

Czech PM Babiš weakened by bizarre turn in farm scandal
The story that's gripped Czechs today is what will happen next in the bizarre case of  »
Czech economic growth now slowing
The Czech economy has peaked, according to the Czech Banking Association (CBA). While GDP  »
Multifunctional sports complex going up in Stauceni
Construction started on the Arena Chisinau multifunctional sports complex in Stauceni, Mol  »
Bechtel to build €800m Morava Corridor in Serbia
Bechtel Corporation has signed a memorandum of understanding and cooperation with the Serb  »
What do you get when you mix an old-fashioned labor shortage crisis with the new excitemen   »
Golub Gethouse may be best known for its office projects, but the company is looking to ex   »
Projects have been chosen from the winners of the CIJ Awards series across CEE last year a   »
Echo Investment sold 1,427 apartments in 2017, up 54 percent from the previous year. The d   »