New solar plant to begin operating along Montenegrin coast by 2021

New solar plant to begin operating along Montenegrin coast by 2021

Published at: 2019-05-08 09:35 | Author: CIJ Serbia
A new 250 MW solar power plant will be developed in Briska Gora, near Ulcinj, along the Montenegrin coast. The first phase of construction, valued at €45m, is scheduled to start soon, with operations to begin by the end of 2021. The project’s total costs are expected to exceed €200m. Sterling and Wilson will oversee development. The other investors include EPCG and Fortum.

Similar Stories:

In north Serbia new windfarm to be build
Maestrale Ring, a Belgrade-based company, will build a major wind turbine facility in nort  »
Largest solar power plant in Europe going up in Montenegro
The largest solar power plant in Europe is currently under construction in Birska Gora nea  »
Hungary to continue cooperation with Gazprom
Gazprom will continue to supply gas to Hungary, according to Minister of Foreign Affairs a  »
MB Holding opens geothermal power plant in central Croatia
MB Holding opened a geothermal power plant in Ciglena near Bjelovar. The Turkish company i  »
Energoprojekt as investor is obliged to build a 40,000 sqm railway station, which includes   »