New residential and business complex under construction in Podgorica

New residential and business complex under construction in Podgorica

Published at: 2019-08-30 09:53 | Author: CIJ Serbia
The Montenegrin company Master Inzenjering started construction works on a residential and business complex in Podgorica near the Delta City shopping mall. The new complex, called Master kvart, is designed as a 3-building complex and will require an investment of €11m. Bemax is in charge of construction, which should be completed in 2021. The location is a former industrial zone that's currently undergoing redevelopment, with other projects now ongoing in the vicinity.

Similar Stories:

Sweat Concept One leases 2,210 sqm at The Light One
Sweat Concept One has leased 2,210 sqm at The Light One mixed-use project, developed by Ri  »
French Revolution signs lease at The Bridge 3 office building
French Revolution signed a lease on a ground-floor unit at The Bridge 3 in Bucharest’s O  »
Real estate deals fall to six-year low in Romania
Romania’s real estate investment volume totaled roughly €500m during the first three q  »
At the CIJ Awards Romania, 28 projects, transactions and property professionals were honor  »
Czech Republic  ♦  Hainc : Prague needs density
CIJ: In 2016, the Metropolitan plan was in chaos. The head of the plan had been fired and   »
And it’s not just shift workers to man the machines and assembly lines and to stack good   »
Czech Republic  ♦  It‘s Prague 4 vs. The World
Prague 4 appears to have done away with formalities and diplomatic language and made it cl   »
This reflected economic and political reality, as the country is being pulled in differing   »