Enel takes over two photovoltaic power plant projects from Mytilineos group

by   CIJ News iDesk V
2021-09-07   10:10
/uploads/posts/4900b5c6499ca8cb4d2128e78925cd2a3314d394/images/1974943790.jpg

Enel Green Power has signed with the Greek Renewables & Storage Development Division from Mytilineos to take over two photovoltaic power plant projects, with a total capacity of approximately 90 MW.

The first project will have an installed capacity of 63 MW and will be implemented in Călugareni, Giurgiu County, and the second will have an installed capacity of 26 MW and will be built in Moşteni, Teleorman County.

The construction works are scheduled to start at the end of this year, respectively the first part of next year.

Switzerland
Albania
Asia
Austria
Belgium
Bosnia & Herzegovina
Bulgaria
Central Europe
China
Croatia
Czech Republic
Denmark
Estonia
Europe
Finland
France
Germany
Greece
Spain
Hungary
Italy
Kosovo
Latvia
Lithuania
Luxembourg
Moldova
Montenegro
Netherland
North Macedonia
Norway
Poland
Portugal
Romania
Russia
Serbia
Slovakia
Slovenia
Sweden
Ukraine
United Kingdom
USA