Turawell to build power plant, greenhouse in Tura

by   CIJ News iDesk II
2016-05-25   10:29
/uploads/posts/aae45de30e40d5b9ad47365cfcc27c097b7b0948/images/Construction-Industry.png

Turawell is planning to build a geothermal power plant and greenhouse in Tura, about 50 km from Budapest. The project is expected to cost HUF 10bn, with an additional HUF 2.1bn for preparation work. The 2.7 MW power plant is expected to generate enough electricity to power 800 homes. Completion is set for 2017. KS Orka Renewables, Turawell’s majority shareholder, will oversee the construction of the power plant, which will provide thermal energy to facilities in the area. A consortium of Bauforg, Forrásker-Tész and Venlo Plus will build the greenhouse, which is expected to produce 6,300 tons of tomatoes per year, generating HUF 6 to 7bn in revenue.

Switzerland
Albania
Arabia
Asia
Austria
Belgium
Bosnia & Herzegovina
Bulgaria
China
Croatia
Czech Republic
Denmark
Estonia
Finland
France
Germany
Greece
Spain
Hungary
India
Italy
Kosovo
Latvia
Lithuania
Luxembourg
Moldova
Montenegro
Netherland
North Macedonia
Norway
Poland
Portugal
Romania
Russia
Serbia
Slovakia
Slovenia
Sweden
Ukraine
United Kingdom
USA