Panattoni completes new production facility for Valmet Automotive in Żary
by CIJ News iDesk III 
2025-05-27 
logistics
/uploads/posts/6635a2c8858ac29863d6c7013157ded53df2fa8a/images/310133555.jpg

Panattoni has delivered a new build-to-suit (BTS) manufacturing and logistics facility for Valmet Automotive in Żary, Poland. The project expands the company’s existing site and is designed to support the production of advanced roof and kinematic systems for the automotive industry, responding to increasing demand for components that improve vehicle aerodynamics. The facility spans 8,800 square metres and has been tailored to Valmet Automotive’s operational requirements. The plant will produce kinematic systems developed at the company’s research centre in Osnabrück, Germany. These systems are relevant for both electric and conventional vehicles, contributing to improved energy efficiency and reduced fuel consumption. The investment is part of Valmet Automotive’s broader strategy for expanding its operations in Europe. The expansion in Żary is expected to significantly boost production capacity and will lead to the creation of approximately 350 new jobs. Designed for operational flexibility, the layout of the new building allows for future adjustments in production and logistics functions. The facility is also expected to be certified under the BREEAM system at the Excellent level, reflecting its adherence to environmental and sustainability standards. Valmet Automotive representatives noted that the project was delivered in close coordination with Panattoni’s BTS division. The development was managed alongside the ongoing operations of the existing plant, ensuring continuity during the expansion phase. According to Valmet Automotive, the new facility positions the Żary plant for further growth within the company’s European manufacturing network. The investment also reflects a broader trend of industrial development in mid-sized cities, with Żary serving as an example of how regional locations can support advanced manufacturing. Panattoni stated that its role in the project was to provide modern infrastructure that meets the specific needs of its client while supporting local and regional development goals. The facility is now ready for full operational use.