PGE and Ørsted form 50-50 joint venture on Baltica 2 and 3

by   CIJ News iDesk II
2021-02-17   09:34
/uploads/posts/ea89ad396ccf711d4d0f06408f7a5b04fda1909d/images/1983224877.png

Ørsted and PGE Polska Grupa Energetyczna (‘PGE’) have signed an agreement to form a 50/50 joint venture for the development, construction and operation of two offshore wind projects in the Baltic Sea with a total potential capacity of up to 2.5 GW. Ørsted will subscribe for new shares representing 50% of the total share capital in PGE’s two offshore wind projects, Elektrownia Wiatrowa Baltica-3 sp. z o.o. (‘Baltica 3’) and Elektrownia Wiatrowa Baltica-2 sp z o.o. (‘Baltica 2). Baltica 3 has a capacity of 1 GW and Baltica 2 has a capacity of 1.5 GW. The subscription price for the newly issued shares in Baltica 2 and 3 will amount to a total of PLN 657 million.

Both projects are eligible to be included in Poland’s 2021 offshore wind allocation round, where a total of 5.9 GW is expected to be awarded. Baltica 3 is the most advanced of the two projects and could become operational in 2026, informed PGE.

Switzerland
Albania
Asia
Austria
Belgium
Bosnia & Herzegovina
Bulgaria
Central Europe
China
Croatia
Czech Republic
Denmark
Estonia
Europe
Finland
France
Germany
Greece
Spain
Hungary
Italy
Kosovo
Latvia
Lithuania
Luxembourg
Moldova
Montenegro
Netherland
North Macedonia
Norway
Poland
Portugal
Romania
Russia
Serbia
Slovakia
Slovenia
Sweden
Ukraine
United Kingdom
USA